PROJECTS  >  Pipelines

KEY FACTS
CLIENT
MURPHY PIPE & CIVIL
PROJECT DURATION
WORKS REQUIRED
PROJECT VALUE

Murphy Pipe & Civil (MPC) was contracted by QGC to install its entire upstream Gas Gathering Network across the Surat Basin Gas Fields. This project is the largest Gas Gathering Network of its kind in Australia and entails the installation of more than 5000km + of dual and single 110mm – 630mm HDPE pipeline and installation and tie-in of well heads. Starting in June 2014, GMCCS commenced work on the As-constructed surveys of all below and above Ground Pipes, Tie-In Points to Well Heads and various other Drainage Piping Systems.

GMCCS was also involved in the mapping of surface levels prior to pipe installation and afterwards in the Rehabilitation stage, the set out of gas marker signs and change in depths..









OTHER PIPELINE PROJECTS COMPLETED BY GMCSS

QCLNG Rising Main to Wieambilla Creek 5500m
QCLNG Brine pipe from KWTP to Wieambilla Creek 5500m
QCLNG KWTP to Orana 5 963m
QCLNG Fuel Gas Line F02 FCS to KWTP 2500m
QCLNG Raw Water Lines to Orana 5 4000m
Laing O’Rourke
Laing O’Rourke
Laing O’Rourke
Laing O’Rourke
Laing O’Rourke
GLNG Trunk Lines 35000m
GLNG Flow Lines 7000m
APA Yard Piping Line 150m
QCLNG Gathering Project
MACDOW
MACDOW
Downer
MPC

 






GMCCS